Regression testing pbi in Azure board

Regression testing a Product Backlog Item (PBI) in Azure Boards involves retesting the PBI after changes have been made to ensure that the new changes have not introduced any new defects or issues. Here are the general steps to perform regression testing on a PBI in Azure Boards:

1. Identify the PBI to be tested: Select the PBI that has been modified or updated and needs regression testing.

2. Understand the scope of changes: Review the changes made to the PBI, including code changes, feature enhancements, bug fixes, etc.

3. Create test cases: Based on the scope of changes, create or update test cases to cover all the scenarios that need to be tested for regression.

4. Execute test cases: Execute the test cases on the updated PBI to verify that the changes have been implemented correctly and that existing functionality has not been impacted.

5. Report defects: If any defects are found during regression testing, report them in Azure Boards and track them to resolution.

6. Re-test: After defects have been fixed, re-run the regression tests to ensure that the issues have been addressed and no new defects have been introduced.

7. Update test documentation: Finally, update the test documentation to reflect any changes made during regression testing.

By following these steps, you can effectively conduct regression testing on a PBI in Azure Boards to ensure the quality and stability of your software product.

Comments

Popular posts from this blog

What Does a SM-SCRUM MASTER do “All the Day”

When to choose scrum and when to choose kanban? Explained with examples

Kanban board setup for AMS teams in SAP